A.P. Moller-Maersk (Maersk) is strengthening its omnichannel-fulfilment capabilities in Singapore, with World Gateway 2, a brand new 1.1 million sq. ft. facility being built in Jurong West. The ground-breaking ceremony was held on July 19, 2023, and this distribution centre is expected to be completed in the first quarter of 2025.
Strategically located in the industrial area with direct access to major highway – Ayer Rajah Expressway (AYE), the facility has convenient access to Tuas Mega Port and Changi International Airport. It is also within close proximity to World Gateway 1, currently Singapore’s largest automated and customs bonded warehouse. The new distribution centre is designed to have a capacity of 30,000 pallet Automated Storage & Retrieval System (AS/RS), with a large floorplate of 160,000 sq. ft. This multi-story facility will have a high ceiling with 11-metre clear height per floor, suitable for dense storage and automation. Equipped with ample loading bays and container parking places to manage peak season volumes, it caters to the booming e-commerce fulfilment needs, as well as offering logistics solutions for different industries, including Footwear & Apparel, Beauty & Wellness, Healthcare, Luxury Fashion products across Asia and the rest of the world.
Supporting customers’ emissions targets and strengthening sustainable solutions is one of the strategic priorities for Maersk. This new facility will be both LEED Platinum- and Green Mark Platinum-certified for its outstanding design and performance in environmental aspects. It will be equipped with motion sensor-LED lights, solar panels, composite panel façade system for building insulation, and building management system for energy efficiency.